32 Job openings found

1 Opening(s)
14.0 Year(s) To 20.0 Year(s)
40.00 LPA TO 45.00 LPA
The EBOP Lead – O&M (AGM/DGM) for a renewable energy corporate office manages the enterprise-wide electrical Balance of Plant (eBoP) infrastructure. The role focuses on technical governance, high-voltage asset reliability, grid compliance, and lifecycle optimization across large-scale solar and wind portfolios.   EBOP DGM Role: 220 kv 420kv - O&M Relay Protection, Coordination SLDC, NRLDC ...
3 Opening(s)
4.0 Year(s) To 7.0 Year(s)
5.00 LPA TO 15.00 LPA
  Job Description   Profile                          - Manager/Astt Manager - Project Execution/Management Desired Qualification   - B. Tech / B. E. (Electrical / Instrumentation) Experience                  - 4 ~ 7 years of working experience Base Location              - Noida / Delhi NCR Travelling                    - Around 90% within India / Outside India   Required skillset          - Administration - Should be having experience of ...
10 Opening(s)
10.0 Year(s) To 20.0 Year(s)
10.00 LPA TO 15.00 LPA
Name of Post : DGM / Sr. Manager (Electrical Maintenance Dept.) 2 Job assigned/Job profile :  Monitor boiler reliability, pressure parts healthiness, and shutdown overhauling activities.  Overall responsible for operation and maintenance activities of the respective department.  Ensure safe, reliable, and efficient plant operation in line with ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 5.00 LPA
JD for Electrical Engineer   HT System -66KV PCC - Switchyard Power Distribution Variable Frequency drive Selection of Equipment Knowledge for SAP, ISO etc. Electrical Safety System HT & LT breakers. Graduate Engineer with 4 to 5 years experience.   CTC up to : 5 Lakh.     Work Location: Ankleshwar   Kanoria Chemicals & Industries Limited
1 Opening(s)
6.0 Year(s) To 12.0 Year(s)
20.00 LPA TO 25.00 LPA
Securing CTU/STU grid connectivity Keeping close track of the planed/under construction/upcoming transmission schemes/status/schedules etc.Detail knowledge of different state connectivity process/guidelines/policies etc.Detail knowledge of substation and transmission line construction activities.Top on procedure/requirements/risks to lead entire process independently. Market Intelligence - Market intelligence of competitors presence /action plan in & around planned project area /substations.- ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 5.00 LPA
JD for Electrical Engineer   HT System -66KV PCC - Switchyard Power Distribution Variable Frequency drive Selection of Equipment Knowledge for SAP, ISO etc. Electrical Safety System HT & LT breakers. Graduate Engineer with 4 to 5 years experience.   CTC up to : 5 Lakh.     Work Location: Ankleshwar   Kanoria Chemicals & Industries Limited
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 5.00 LPA
JD for Electrical Engineer   HT System -66KV PCC - Switchyard Power Distribution Variable Frequency drive Selection of Equipment Knowledge for SAP, ISO etc. Electrical Safety System HT & LT breakers. Graduate Engineer with 4 to 5 years experience.   CTC up to : 5 Lakh.     Work Location: Ankleshwar   Kanoria Chemicals & Industries Limited
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 5.00 LPA
JD for Electrical Engineer   HT System -66KV PCC - Switchyard Power Distribution Variable Frequency drive Selection of Equipment Knowledge for SAP, ISO etc. Electrical Safety System HT & LT breakers. Graduate Engineer with 4 to 5 years experience.   CTC up to : 5 Lakh.     Work Location: Ankleshwar   Kanoria Chemicals & Industries Limited
2 Opening(s)
8.0 Year(s) To 15.0 Year(s)
Not Disclosed by Recruiter
Position-  Electrical DesignerExperience - 8+Qualification - Diploma - ElectricalIndustry - Oil& Gas /Power.Location - OmanInterview -  VirtualSalary - 1000- 1100 OMR + Bachelor Accommodation Job Description :8 to 10 Years of experience in Preparation of Detailed Electrical Engineering Drawings Substations Single Line Diagrams, Equipment Layouts, Switchyard LayoutsCable Trench/ Routing Layouts, Cable Schedules, Bulk MTOs, Lighting and Earthing Layouts using ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.80 LPA TO 3.00 LPA
1.Diploma/ ITI in Electrical with 1 years of relevant maintenance experience in substation & similar Utility plant such as Chillers, cooling towers, compressors, HT LT Motors, pumps, etc..  2.Should have sound knowledge& skill on best maintenance practices, procedures and systems.3.Shall be well versed and experienced with LOTO procedures of HT and ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile