1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
4.00 LPA TO 6.00 LPA
Designation : Service Engineer2 Schaltbau products : Contactors, Snap action Switches, Connectors and rail components like Master controllers, VCB, earthing devices etc.3 Application Industry : Railways ( including system manufactures), Steel, Cement, Material handling, Renewable energy,Electric vehicles4 Requirement: Schaltbau has a wide range of products like contactors,snap action switches, connectors,master ...
1 Opening(s)
6.0 Year(s) To 7.0 Year(s)
3.50 LPA TO 5.50 LPA
signation : Sr. Manager - Production 2 Schaltbau products : Contactors, Snap action Switches, Connectors and rail components like Master controllers, VCB, earthing devices etc.. 3 Application Industry : Railways ( including system manufactures), Automobiles, Renewable.. 4 Requirement: Schaltbau has range of products like master controllers, displays, driver's desk, panels ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
6.00 LPA TO 8.00 LPA
Designation : Sr. Executive - Stores2 Schaltbau products : Contactors, Snap action Switches, Connectors and rail components
like Master controllers, VCB, earthing devices etc..3 Application Industry : Railways, Renewables, Electric vehicles,...4 Requirement: Schaltbau has range of products like master controllers, contactors,
displays, driver's desk, panels etc.Schaltbau is keen to have Sr.Executive - ...
1 Opening(s)
12.0 Year(s) To 15.0 Year(s)
20.00 LPA TO 24.00 LPA
Designation : Sr. Manager - Production 2 Schaltbau products : Contactors, Snap action Switches, Connectors and rail components like Master controllers, VCB, earthing devices etc.. 3 Application Industry : Railways ( including system manufactures), Automobiles, Renewable.. 4 Requirement: Schaltbau has range of products like master controllers, displays, driver's desk, panels ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 4.80 LPA
Key Responsibilities1. Panel Layout & Schematic Design Design Single Line Diagrams (SLD), electrical schematics, and wiringdiagrams. Create General Arrangement (GA) drawings and 2D/3D layouts forindustrial control panels. Optimize structural layouts for internal wiring, cable routing, busbar sizing,and cooling systems. Draft detailed component fitment plans for PLC units, MCBs, contactors, andswitches.2. ...
3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
Carry out preventive, breakdown and routine electrical maintenance of plant equipment.• Troubleshoot and maintain Motors, MCC, PCC, Control Panels, VFDs, Starters, Contactors, Relays and electrical circuits.• Attend electrical breakdowns and ensure minimum equipment downtime.• Maintain and troubleshoot pumps, agitators, compressors and other plant machinery electrical systems.• Check and maintain cables, ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.80 LPA TO 2.16 LPA
Department: Maintenance / Electrical Location: Mehsana, Kalol, Chhatral, or nearby only
Qualification
ITI in Electrician / Electrical Trade preferred.
Relevant industrial electrical certification will be an advantage.
Experience
1–3 years of industrial experience preferred.
Candidates with relevant experience in machinery/manufacturing industries will be preferred.
Key Responsibilities
Perform electrical installation, maintenance, and repair work.
Maintain electrical panels, motors, machines, control ...
- Electrician
- Electrical Maintenance
- Electrical Installation
- Electrical Repair
- Electrical Troubleshooting
- Preventive Maintenance
- Control Panels
- Machine Wiring
- Electrical Panels
- Cable Maintenance
- Electrical Commissioning
- Breakdown Maintenance
- Fault Finding
- Maintenance Records
- Industrial Safety
- Machine Maintenance
- Team Coordination
1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
Not Disclosed by Recruiter
Key Responsibilities
Electrical Design & Engineering
Prepare complete electrical designs for LT Control Panels and Automation Panels.
Prepare Single Line Diagrams (SLD), Power & Control Circuit Diagrams and Wiring Diagrams.
Develop panel GA drawings, component layouts and internal wiring drawings.
Select suitable electrical components based on technical requirements.
Prepare and verify BOM (Bill of Material).
Calculate cable ...
3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
Key Responsibilities:• Carry out preventive and breakdown maintenance of electrical equipment.• Troubleshoot motors, starters, MCC panels, DBs, control panels and electrical circuits.• Handle installation, testing and maintenance of electrical equipment and plant wiring.• Attend electrical breakdowns and ensure minimum equipment downtime.• Perform maintenance of motors, pumps, lighting systems, cables and ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 2.88 LPA
An outlines a skilled professional who installs, maintains, and repairs electrical power, lighting, and control systems in residential, commercial, and industrial buildings.
Key Responsibilities
Installation: Set up electrical controls, wiring, lighting systems, fixtures, switches, and outlets.
Maintenance: Inspect transformers, circuit breakers, and other electrical components regularly.
Troubleshooting: Diagnose and fix electrical malfunctions and wiring ...
- Electrician
- Electrical Technician
- Electrical Maintenance Technician
- Industrial Electrician
- Plant Electrician
- Maintenance Electrician
- Electrical Supervisor
- Electrical Helper
- Senior Electrician
- Electrical Maintenance
- Plant Maintenance
- Industrial Electrical Maintenance
- Electrical Installation
- Electrical Wiring
- Cable Laying
- Cable Termination
- Control Panel
- Mcc Panel
- Pcc Panel
- Lt Panel
- Ht Panel
- Motors
- Starters
- Contactors
- Relays
- Transformers